Streets Division

The Streets Division is responsible for the maintenance and repair of Edina's more than 230 miles of city streets, public parking lots, street signs and pavement markings.

This responsibility is divided into the bituminous (blacktop) streets and concrete street crews. Approximately 80 percent of Edina's streets are paved with a flexible bituminous pavement. The pothole repairs, street sweeping, crack sealing, majority of overlay projects and sealcoating are performed by the bituminous street crews. The concrete crews handle the concrete street repairs, concrete curb and gutter and sidewalk replacements.

POTHOLES

 

SNOWPLOWING

 

STREET REPAIR

 

STREET SWEEPING

Public Works Department

7450 Metro Blvd. 
Edina, MN 55439

Mail@EdinaMN.gov
Public Works Department: 952-826-0376
City's Utility Billing Division: 952-826-0373.

Hours:
Monday - Friday
7 a.m. - 3:30 p.m.

© 2017 City Of Edina, Minnesota